This unit of competency specifies the outcomes required to estimate materials, overheads, labour and time requirements and establish costs for the provision of products and services for construction work.
The unit supports tradespersons and those in independent construction job roles to cost a construction project or part of a construction project. It applies to construction work on residential and commercial sites.
No licensing, legislative, regulatory, or certification requirements apply to this unit of competency at the time of endorsement.
Nil
Common
Construction
This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below. |
|
Plans and specifications must include three or more of the following: |
building codes conceptual and preliminary sketches or drawings environmental requirements relating to the acquisition, use and disposal of materials project brief and scope of works, including relevant project plans and detailed project requirements quotation conditions and terms of contract relevant Australian standards and industry standards. |
Types and quantities of materials must include five or more of the following: |
aluminium brick and blockwork cement, sand, aggregates and bonding agents claddings decorative finishes doors, windows and trims fillers fixings and fastenings glazing hardware medium density fibreboard (MDF) or alternative substrate panelling paint prefinished boards and laminates solid surfaces steel tiles timber. |
Labour costs must include: |
estimation of time for manufacture, delivery, installation or application personal protective equipment (PPE) wages and on-costs for different types of construction workers. |
Overhead costs must include: |
administration insurance transport use of communication technology. |
Other project-specific costs must include at least two of the following: |
plant and equipment hire project-related signs site facilities statutory fees and charges transport and delivery charges waste removal fees. |
Costing documents must include three of the following: |
costing spreadsheets job sheets labour time allocation materials lists and estimates quotation templates take-off sheets. |
CPCCCM2003B Calculate and cost construction work
Not sure where to start? Sign up to download unit details or start mapping in Michi's help.
Effortlessly sync unit data from training.gov.au
Create mapping groups from one or more units, for streamlined unit & cluster mapping.
Easily download your maps stylised to your taste as Excel, Word, or PDF documents
Receive an alert whenever training.gov.au updates or supersedes a unit you have mapped. Choose to apply the update, or migrate your map
Experience the efficiency of our AI-driven tools that make importing and organising your mapping content effortless.